Project Management Software Compared

The same 35 criteria for every tool: scheduling, risk, resources, costs, governance, AI, data sovereignty and price.

Reviewed: September 7, 2026

The individual comparisons

One page per tool: the strengths of WORKSPACE.PM with links to the features, two comparison tables, prices side by side and the migration path.

The checklist: every tool, the same criteria

What you would ask in a tender or requirements specification anyway, answered up front.

Included
Included
Included · without a plan upgrade or add-on
Limited
Limited
Limited · tied to a plan, add-on or condition
Not included
Not included
Not included · not offered according to public sources
Not documented
Not documented
Not documented · not found in the public documentation
CriterionWORKSPACE.PMAsanamonday.comMicrosoft ProjectJiraOpenProjectProjektron BCSWrike
Scheduling
Network diagram with critical path and floatIncludedForward and backward pass, early/late start and finish, total float, dedicated network viewLimitedCritical path from Advanced as a highlight; float not documentedLimitedCritical path as a highlight from Pro (trial feature); float not documentedLimitedCritical path from Plan 3; network diagram and slack in the desktop clientNot documentedTimeline and plans; network calculation not documentedNot documentedCritical path not documentedLimitedNetwork plan and Gantt; float and critical path not listedLimitedCritical path from Business; float not documented
Dependencies FS/SS/FF/SF with lagIncludedBy text entry (e.g. 6.4FF+3) or by dragging; cross-project between milestonesLimitedDependencies between tasks; types and lag not documentedLimitedFrom Pro with lead/lag; cross-board EnterpriseLimitedFour types from Plan 3; lag in the desktop clientLimitedBlocks/blocked by; types with lag not documentedLimitedFollows/precedes with lag; other types not documentedLimitedDependency relations; types and lag not documentedLimitedFour types with lead/lag; Gantt from Team
Baseline comparisonIncludedSeveral baselines per project, compare any two, delta calculatedLimitedBaseline as a date snapshot in the Gantt viewLimitedFrom Pro; snapshots not editableLimitedFrom Plan 3; up to eleven baselines in the desktop clientNot documentedScenarios from Premium; baseline not documentedLimitedEnterprise add-onIncludedPlan versions and milestone trend analysisLimitedBaseline tracking and snapshots
Milestone trend analysis (MTA)IncludedDedicated MTA view next to Gantt and network diagram; reporting dates from the reporting interval, trend rating per milestone, PNG/PDF exportNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedIncludedMilestone trend analysis for schedule deviationNot documentedNot documented
Work breakdown structure with WBS codesIncludedAutomatic or manual, stable as an external reference; seven progress methodsNot documentedSubtask levels; WBS codes not documentedNot documentedSubtask levels; WBS codes not documentedLimitedIn the desktop client; not documented in Planner premiumNot documentedEpic/story/subtask; WBS codes not documentedNot documentedHierarchy; WBS codes not documentedLimitedWBS with templates; codes not documentedNot documentedNot documented
Traditional and agile planning in the same projectIncludedNetwork diagram, Scrum backlog with sprint board, burndown and velocity, Kanban in one projectLimitedList, board, timeline; network diagram and sprint metrics not documentedLimitedBoards, Gantt and Kanban; network diagram not documentedLimitedSprints from Plan 1, timeline from Plan 3; network diagram in the desktop clientLimitedScrum and Kanban native; network diagram not documentedLimitedGantt and basic boards; action boards EnterpriseIncludedGantt, Kanban, ScrumLimitedBoard and Gantt; network diagram not documented
Import of MS Project and other schedule filesIncludedMS Project (.mpp, XML) including dependencies and assignments; Primavera P6, Asta; CSV; TrelloNot documentedCSV import available; MS Project import not documentedNot documentedExcel/CSV import; MS Project import not documentedIncludedNative formatLimitedCSV and API; MS Project via MarketplaceLimitedExcel sync; MS Project sync not maintainedLimitedExcel import; MS Project not listedIncludedMS Project import with dependencies and lead/lag
Risk management
Risk register with rating and review cyclesIncluded5×5 matrix with gross/net, review cycles of 30 to 365 days, review history, convert risk to taskLimited“Risk reports” in the feature matrix; register with rating system not documentedLimitedBoard template; “Portfolio Risk Insights” EnterpriseNot documentedNot documentedNot documentedNot documented (Marketplace)LimitedRisk as work package type; rating not documentedIncludedOpportunity and risk analysis with diagramsLimitedAI risk prediction; register not documented
Monte Carlo simulation and bowtie analysisIncludedPERT distribution, 10,000 iterations, P50/P80/P90, reserve as cost item; bowtie diagramNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documented
Measures with reduction value and key risk indicatorsIncludedPreventive and corrective with reduction value, cost, deadline; KRIs with threshold alertsNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedLimitedCountermeasures; early indicators not documentedNot documentedNot documented
Resources and time
Capacity and utilization planning without a plan upgradeIncludedOrganization-wide utilization matrix for people and machines, availability check with absencesLimitedWorkload from Advanced, capacity planning from EnterpriseLimitedWorkload widget from Pro; Resource Planner and Capacity Manager EnterpriseLimitedHeatmap from Plan 5; resource sheet in the desktop clientLimitedCapacity per team in plans from PremiumLimitedTeam planner as Enterprise add-onIncludedUtilization mountains, across projectsLimitedWorkload from Business; capacity planning in Pinnacle
Several resources per work package with plan and actualIncludedSeveral people and machines with planned and actual effort, actuals derivable from time trackingLimitedOne assignee per task; effort shares not documentedLimited“Only one resource can be assigned per task”LimitedIn the desktop client with unitsLimitedOne assignee per issueLimitedOne assignee per work packageLimitedStaffing by skills; effort shares not explicitly documentedLimitedSeveral assignees; effort shares not documented
Skill pools before names are assignedIncludedBook effort on a skill, resolve to people or machines laterNot documentedNot documentedNot documentedNot documentedNot documentedNot documented in Planner premiumNot documentedNot documentedNot documentedNot documentedLimitedStaffing by skills; placeholders not documentedNot documentedJob roles in Pinnacle
Time tracking with approval workflowIncludedWeekly timesheets, one- or two-stage approval, auto-approval within tolerance, bulk approvalLimitedBasic from Advanced, add-on €5.99; approval workflow not documentedLimitedTime tracking column from Pro; approval workflow not documentedNot documentedWas in Project Online; not documented in Planner premiumLimitedTime tracking per issue; approval not documentedLimitedLog time; approval not documentedIncludedTime recording with approval workflowLimitedTime tracking from Business; approval not documented
Costs and evidence
Cost types with account number and Capex/OpexIncludedTenant-wide catalogue with account number, Capex/Opex; cost forecast from bookingsLimitedBudgets in the add-on; cost types not documentedLimitedNumber and formula columns; cost types not documentedLimitedCost resources in the desktop client; catalogue not documentedNot documentedNot documented (Marketplace)LimitedCost types and budgets; account number not documentedLimitedMulti-level cost planning; account number not documentedLimitedBudgeting in Pinnacle; catalogue not documented
Personnel costs automatically from effort and rateIncludedFrom assignment or time tracking times hourly rate, plan and actualNot documentedNot documentedNot documentedNot documentedLimitedIn the desktop client from rate times workNot documentedNot documentedLimitedFrom logged time and ratesIncludedPersonnel and material costs from effortsLimitedHourly rates and plan/actual in Pinnacle
Earned value analysisIncludedPV, EV and AC recorded per as-of date, earned value dashboardNot documentedNot documentedNot documentedNot documentedLimitedIn the desktop client; not documented in Planner premiumNot documentedNot documentedNot documentedNot documentedIncludedEarned value analysisNot documentedNot documented
Status reports with approval workflowIncludedDraft, submitted, approved; locked as-of snapshots; roll-up into the portfolioLimitedStatus updates; approval workflow not documentedNot documentedDashboards; approval workflow not documentedNot documentedNot documentedNot documentedNot documentedLimitedProject status attribute; approval not documentedNot documentedTachometer overviews; approval not documentedNot documentedNot documented
Governance and knowledge
Change requests with impact dimensions and approversIncludedRegister with category, impact dimensions, approvers, risk linkNot documentedApproval tasks; register not documentedNot documentedBoard templates; register not documentedNot documentedNot documentedLimitedIn Jira Service Management (separate product)LimitedAs work package type; approvers not documentedLimitedVia the ticket systemLimitedRequest forms; register not documented
Quality gates with release criteriaIncludedDedicated node type in the structure tree with release criteria and votingNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documented
Responsibility matrix (AKV, RACI-style)IncludedPeople × work packages, markers A/E/I/K/M/P, external people possibleNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documented
Stakeholder register with environment analysisIncludedRegister with action plan, 2×2 environment analysis, stakeholder portfolio with strategy quadrantsNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documented
Meetings with minutes and decisionsIncludedMinutes with mentions, decisions with approval status, series evaluation, Outlook couplingNot documentedNot documentedNot documentedNot documentedNot documentedNot documented (Teams separate)LimitedConfluence template (separate product)LimitedMeetings module; decision approval not documentedLimitedCalendar; decision approval not documentedNot documentedNot documented
Requirements management (Automotive SPICE, V-Modell XT)IncludedPresets per project, verification items with runs, audit trailNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documented (Marketplace)Not documentedNot documentedLimitedMethods named; verification items not documentedNot documentedNot documented
Goals and strategy (OKR) linked to projectsIncludedStrategy fields, OKR cycles, six key result types, alignment matrix, gap analysisLimitedGoals, plan-dependentNot documentedNot documentedLimitedGoals in the premium plansNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documented
AI
AI acts only after approvalIncludedEvery write action with approve/reject in the chat; permissions of the signed-in userLimitedAsana AI available; approval before changes not documentedLimitedmonday AI available; approval before changes not documentedLimitedCopilot in premium plans; approval requirement not documentedLimitedAtlassian Intelligence from Premium; approval requirement not documentedNot documentedNot documentedNot documentedNot documentedLimitedAI from Team/Business; approval requirement not documented
Own AI provider or local modelIncludedOwn key (Anthropic, OpenAI, Mistral and others) or local model (Ollama, vLLM); AI off until enabledNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documentedNot documented
Data sovereignty and law
Contracting party based in Germany or the EUIncludedAMNAU GmbH, Hanover; German law, place of jurisdiction HanoverNot includedAsana, Inc., San Francisco; California law according to the Terms of ServiceNot includedmonday.com Ltd., Tel Aviv; US company under the Data Privacy FrameworkIncludedMicrosoft Ireland Operations Ltd. for EU customers; Irish lawLimitedIrish law for EMEA customers; group in Australia/USAIncludedOpenProject GmbH, BerlinIncludedProjektron GmbH, BerlinNot includedWrike, Inc., San Diego; California law
Hosting in German or EU data centers in every planIncludedSaaS and Managed Hosting exclusively in German data centers, in every modelLimitedEU data center Frankfurt only as an Enterprise add-on, included in Enterprise+ via opt-inLimitedEU region Frankfurt only for Enterprise or Standard/Pro from 23 Jan 2023; part of the data in the USLimitedEU Data Boundary (EU/EFTA), no Germany location committedLimitedData residency from Standard, Frankfurt/Dublin; unpinned data placed freelyIncludedEU cloud, Germany on request; on-premises anywhereIncludedCloud with servers in Germany; purchase license on-premisesLimitedEU data center in all plans, location not named, features limited
No US legal entity in the processing chain (CLOUD Act)IncludedNo US legal entity in the processing chain; exception: optional AI with an external model providerNot includedUS company; the CLOUD Act applies regardless of storage locationNot includedUS company in the chain; infrastructure AWS, backup shares on Google CloudNot includedParent company Microsoft Corporation (USA)Not includedParent company Atlassian Corporation (USA)LimitedGerman vendor; infrastructure providers not namedIncludedGerman legal entityNot includedUS company
Data processing agreement under Art. 28 GDPR available before signingIncludedData processing agreement under Art. 28 GDPR on request before signingIncludedDPA publicly available, automatically part of the contractIncludedData processing agreement publicly providedIncludedData Protection Addendum publicIncludedData Processing Addendum publicIncludedDPA publicIncludedDPA as a German processorIncludedDPA provided as PDF
On-premises operation in your own data centerIncludedDocker deployment in your own infrastructure with the same functional scopeNot includedSaaS onlyNot includedCloud service onlyLimitedProject Server Subscription Edition; Planner premium cloud onlyLimitedData Center from 500 users, annual licenseIncludedCommunity and Enterprise on-premisesIncludedPurchase licenseNot includedSaaS only
Price and procurement
Full feature set without editionsIncludedNo editions; every account has the full feature setNot includedFive plan tiers, features distributed across themNot includedFive plans; project features distributed from Standard to EnterpriseNot includedPlan 1, Plan 3, Plan 5 and desktop licensesNot includedFree, Standard, Premium, Enterprise; Guard separateNot includedCommunity versus Enterprise add-onsNot includedEditions BCS and BCS.light, modulesNot includedFive plans; SSO and 2FA in Pinnacle
Individual accounts instead of seat bundlesIncludedEvery account booked individually, no seat bundlesNot includedSeat bands: 5s up to 30, 10s up to 100, 25s up to 500Not includedMinimum three seats, then steps of fiveIncludedLicensed per userIncludedLicensed per userLimitedPer user, minimum 25 or 100IncludedPer user (users per 24 hours)LimitedUser ranges per plan (Team 2 to 15, Business 5 to 200)
List prices public for all plansIncludedAll three deployment models with list prices on the pricing pageLimitedStarter and Advanced public; Enterprise and Enterprise+ on requestLimitedBasic to Pro public; Enterprise on requestLimitedPlans public; Project Server via volume licensingLimitedStandard and Premium public; Enterprise on requestLimitedBasic to Premium public; Corporate on requestLimitedPrice ranges public; quote per configurationLimitedTeam and Business public; Pinnacle and Apex on request

Details per cell on the respective comparison page. Reviewed: September 7, 2026.

Frequently asked questions about the comparison

What buyers, PMOs and IT leaders ask us about alternatives and comparisons.

WORKSPACE.PM is operated by AMNAU GmbH from Hanover exclusively in German data centers, in every plan and at no extra charge, and is also available as Managed Hosting or on-premises. Its feature set goes beyond task coordination to network scheduling, resource capacity, a risk register and portfolio reporting. The individual comparisons on this page show where the differences lie for each tool.

That we did not find the feature in the vendor’s public documentation. We only claim what we can prove. If a vendor shows us the feature, we correct the cell.

WORKSPACE.PM writes them, and every page says so. To keep the comparison fair, the same criteria apply to every tool, and all statements about other products come from their own documentation with a review date.

The SaaS model costs €99 per month including five accounts, each additional account €16.80 per month, billed monthly and without editions: network diagram, risk simulation, utilization matrix, earned value and AI assistant are included in every account. Managed Hosting starts at €499 with 20 accounts, on-premises at €1,699 with 50 accounts, each with the same functional scope. The price tables on the comparison pages compute the cost for 5 to 100 users next to the other product’s list price.

Schedules come in as MS Project files (.mpp or XML), Primavera P6 or Asta Powerproject files with dependencies and assignments. Projects, Kanban cards and users come in via CSV import, boards via Trello import, everything else via the REST API. Each comparison page describes the path per tool in the section on switching in practice.

Yes. The trial runs for 30 days with the full feature set and no credit card. Create a real schedule, let the network diagram calculate and check the checklist rows against the product instead of against our description.