Scheduling & network diagram

Every date holds — the critical path calculates itself

Structure and timeline in sync, dependencies drawn by hand, buffers and the critical path calculated automatically. Your whole project schedule lives where the work happens.

Legend
Today
Requirements
Concept
Build
Test
Sign-off
Go-live
Critical pathTaskMilestone

The schedule goes stale the moment it's finished

When planning and execution live in separate tools, every shift costs nerves — and nobody truly recalculates the consequences.

Detached from the work

The plan sits in Excel or MS Project, the work happens elsewhere. Two truths that drift apart after the very first week.

One shift, nobody recalculates

A task slips — but what that means for every successor and the end date stays inside the project lead's head.

Critical path and buffers invisible

Which tasks have slack and which ones drive the end date — you only find out once it's too late.

No comparison to the original plan

Slippage against the approved plan surfaces in the status report — weeks after it happened.

From work breakdown to a schedule you can trust — in four steps

The same flow PMOs have always known — just without the manual number-crunching.

01

Structure

The WBS tree becomes the task table: hierarchical, with WBS code, duration, start, end and owner.

02

Link

Dependencies by dragging between bars or as short text in the predecessor cell — including relation type and offset.

03

Let it calculate

Forward and backward pass yield buffer, critical path and the four network dates — automatically.

04

Track

A baseline freezes the state; every later shift shows up as a delta against that target.

Schedule

Structure and timeline — in sync on one screen

On the left the hierarchical task table, on the right the bar chart on a timeline. Both show the same project, always at the same state. Milestones and quality gates stand out clearly from ongoing work packages as their own symbols.

  • Configurable columns: WBS code, duration, start, end, predecessor, owner
  • Switch the time grid between day, week, month and quarter in one click
  • Milestones and quality gates as point symbols without duration
  • Colour bars by owner, toggle the today line and labels freely
Grid
DayWeekMonthQuarter
WBSTaskDur.
1
Concept phase
10 d
1.1
Requirements
4 d
1.2
Outline concept
6 d
2
Approval QG1
3
Build
18 d
Predecessor
6.2; 6.4FF+3
Outline concept
Build
Drag to link
FS Finish–StartSS Start–StartFF Finish–Finish
Circular reference detected

Dependencies

Capture dependencies as fast as you think them

Drag from the connector of one bar onto the next — the dependency is done. Or type straight into the table row: “6.2; 6.4FF+3” links with relation type and time offset, no dialog needed.

  • Link by dragging directly between two bars in the chart
  • Predecessor cell as short text: WBS code, relation type and offset in one field
  • Circular references are detected and rejected, not silently miscalculated
  • Right-click opens details or clears up broken links

Critical path

The schedule shows you what matters on its own

As soon as dependencies exist, the critical path method works through the network: forward and backward pass yield each task's total float. Tasks with zero float are critical — and highlight on demand.

  • Critical path highlighted at a glance
  • Float corridor on the bar shows the shift range (earliest start to latest finish)
  • Detail dialog with the four network dates, total float and critical flag
  • Fixed dates stay put as hard anchors and are never scheduled away
RequirementsCritical · float 0
Outline conceptCritical · float 0
PrototypeFloat 3 d
BuildCritical · float 0
Float corridor (ES–LF)
Task details
ES9 d
EF18 d
LS9 d
LF18 d
Next critical date in 8 days
ES 0EF 4
Requirements
ES 4EF 10
Concept
ES 4EF 9
Prototype
ES 10EF 28
Build
Critical path
Cycle: 4.1 → 4.3 → 4.1

Network technique

The classic network view — as activity nodes

If you prefer reading dependencies as a node diagram rather than bars on a timeline, open the standalone network view: each task a node with its four dates, the critical path drawn through. An accidental cycle is named as a concrete chain, not dismissed as “calculation failed”.

  • Activity-on-node diagram (CPM) with an absolute or relative time axis
  • Metric: how many days until the next critical date — or whether it's overdue
  • A circular dependency is shown as a readable cycle chain
  • Same critical highlight as the Gantt — one logic, two views

Planning mode

Rehearse schedules before they become binding

In planning mode the Gantt collects your changes client-side and shows how many tasks are affected — only “Save” makes them binding, “Discard” takes it all back. Prefer to commit right away? Switch to live editing.

  • Collect several date changes and save them in one step
  • The save bar shows the number of changed tasks
  • Discard resets the entire draft — risk-free
  • Live editing persists every change instantly when you want it
Live editingPlanning mode
Build +2 d
Test moved
Sign-off rescheduled
3 tasks changed
DiscardSave
Current planBaseline
Concept
Build
TestSlippage +4 d
History
Baseline 1
Baseline 2
Baseline 3
Now

Baseline

Slippage against the approved plan — right in the chart

A baseline freezes all dates at a point in time. In the Gantt it appears as a reference bar beneath the current bar, with the calculated date delta. And the history bar lets you page through every frozen state like a photo album.

  • Baseline bar beneath the current bar, with the delta in days
  • Two saved baselines can also be compared against each other
  • The history bar pages read-only through every plan state
  • “Now” returns to the current, editable plan at any time

Network technique, without the effort of network technique

The worry with Gantt and critical path is always the same: too complex, too much upkeep. That's exactly where WORKSPACE.PM comes in.

Nothing to relearn

Familiar scheduling logic by the book: the four network dates, total float, critical path — exactly as you learned it, only calculated automatically.

Your view stays

Columns, today line, dependency arrows, colour by owner — each person sets up the Gantt once, and the choice persists across sessions.

Share without access

The currently displayed schedule as Excel or PDF — for reports, tenders or the client meeting, with no system access needed on the other side.

The same Gantt, everywhere

One timeline you recognise everywhere

The same Gantt component also renders inside the Kanban board — fed from cards instead of project structure. Drag, resize, dependencies, display options: learn it once, operate it the same everywhere.

Common questions about the Gantt & network diagram

What PMOs and project leads want to know before switching.

No. The complete schedule — editable table, bars, milestones, dependencies and network diagram — lives in WORKSPACE.PM. To hand it to third parties, export the currently displayed Gantt as an Excel or PDF file at any time.

Yes. As soon as dependencies exist between tasks, WORKSPACE.PM computes each task's total float via a forward and backward pass. Tasks with zero float form the critical path and can be highlighted on demand.

The cycle is detected and rejected instead of silently miscalculated. The network view shows you the concrete cycle chain — which task points back to itself through which links — so you can resolve it deliberately.

Yes. In planning mode the Gantt collects your changes and shows how many tasks are affected. Only “Save” commits them, “Discard” takes it all back. For instant commits there's live editing.

Yes. A baseline freezes the schedule and appears in the Gantt as a reference bar beneath the current bar, including the date delta. The history bar also lets you page read-only through every frozen state.