Status reports

Every project reports the same way. The PMO sees instantly where it hurts.

Structured status reports with schedule, cost and performance ratings - pre-filled, approved and rolled straight up into the portfolio cockpit. Reporting that no longer costs anyone half a day.

Status reportWk 29
OverallWatch
ScheduleOn track
CostWatch
PerformanceOn track
Progress62%

Next steps

  • Finalise the requirements spec
  • Provision the test environment
Approval to PMO

Status reports often feel like wasted time

And in the end, no one reliably knows how the project is actually doing.

Every report looks different

One person writes three sentences, the next writes three pages. It's never comparable - and the PMO is left guessing what „on track, mostly“ is supposed to mean.

Reporting eats your Friday

Copying numbers out of five spreadsheets, hunting for the right wording, remembering deadlines. The status report becomes the chore no one wants.

The last report says nothing about the trend

A single „amber“ doesn't tell you whether things are improving or getting worse. Problems only surface once they've already escalated.

Who actually approved this?

Without a clear approval path, unverified figures land in the steering committee. And no one can say which numbers applied on which date.

A reporting cycle instead of a blank page

Four steps that WORKSPACE.PM mostly handles for you.

01

Pre-fill

A new report carries over the values from the last report and the current project state. No blank page, no copy-paste.

02

Rate

Assess schedule, cost and performance with a clear traffic light, then add progress and next steps.

03

Approve

Draft → submitted → approved. Once approved, the state is cleanly and permanently frozen.

04

Roll up

Approved reports roll automatically into the portfolio cockpit - a rollup for programme and PMO with zero manual work.

Structured status reports

The same core metrics in every report

Project leads report to the PMO in a structured way - with progress, schedule/cost/performance ratings and next steps. Instead of free-form text, a register you can filter and compare.

  • Traffic-light rating for schedule, cost and performance in every report
  • Register with filters by status, author, period and search term
  • Progress and next steps in a fixed place - never hunt again
  • Rating trend per dimension, visible across every report

24

Reports

19

Approved

3

In review

2

Overdue

StatusAuthorPeriodSearch
Wk 29 · AlphaApproved
Wk 29 · BetaSubmitted
Wk 28 · GammaApproved
Wk 28 · DeltaDraft
Rating:On trackWatchCritical
Approval workflow

Draft

created by the project lead

Submitted

submitted to the PMO

Approved

officially valid

Values locked

Frozen once approved - no retroactive polishing.

Two-person approval

An approval process, not just a status label

Every status report moves through draft, submitted and approved. Only approved reports count officially - and once approved, the figures are locked.

  • Three stages: draft → submitted → approved
  • Once „approved“, report values are locked against later edits
  • Domain events on status change and approval - wire them to notifications
  • Always traceable which state officially went to the committee

As-of snapshot

The report shows the state as of the reporting date - forever

Flag a project custom field as „show in report“. Every report automatically gets its own snapshot - even when the live value in the project changes later.

  • Flag any custom field as a report field with one click
  • Automatic snapshot per report, pre-filled from the last state
  • A dedicated „Fields“ tab per report for adjustments
  • The report documents the reporting date, not today's live value
Report fieldsAs of 21 Jul
FieldReportLive
Completion62 %71 %
Budget status
Open risks46

The report shows the state as of the reporting date - even after the live value in the project drifts on.

0,94

SPI

0,97

CPI

62 %

Progress

As-ofTimeline
Planned value (PV)Earned value (EV)Actual cost (AC)

Earned value & analytics

Schedule and cost variance - not estimated, calculated

For projects that want to know exactly: capture planned value, earned value and actual cost as of a date. WORKSPACE.PM turns them into an earned-value dashboard with the classic metrics.

  • Planned value, earned value and actual cost per reporting date
  • SPI and CPI at a glance - schedule and cost index
  • Charts embedded right on the status report page
  • Classic earned-value management without a separate tool

Deliverables

Agreed results as their own register

What a project has to deliver doesn't belong in a free-text paragraph. A dedicated deliverables register keeps due date, progress, status and owner trackable.

  • Register with deliverable, owner, due date, progress and status
  • Filter by status - open, in progress, done
  • Full create, edit and delete straight from the interface
  • No more digging through old reports for who delivers what by when
Deliverables12 total
DeliverableDueProgressStatus
Requirements31.07.100%Done
Prototype15.08.70%Active
Test concept22.08.40%Active
Rollout plan05.09.0%Open

Portfolio cockpit

rolled up from approved reports

24Projects
On track14
Watch6
Critical4
ProjectSCPOverall
Project AlphaOn track
Project BetaCritical
Project GammaWatch

Roll up to the PMO

Many reports become one portfolio view

Approved status reports roll up automatically into the portfolio view. The PMO sees the schedule light per container and the overall status of every project - without opening a single report.

  • Approved project and container reports roll into the portfolio cockpit
  • Schedule light and schedule health per container, computed server-side
  • Project status across the whole portfolio at a glance
  • The big picture - without any manual collating

Reporting that doesn't become a burden

The most common objection from project leads: „another report.“ That's why WORKSPACE.PM takes the work out of reporting.

The report makes the first move

Every new report carries over the values from the last report and the current project state. You correct, instead of starting from zero.

It reminds you

Due reports are announced in good time and can trigger workflows. You no longer have to keep deadlines in your head.

Structure once, the same everywhere

Fixed core metrics instead of a new format per project lead. Comparability without extra effort - for everyone involved.

KPIs & dashboards

Reports become living metrics

What sits inside status reports doesn't have to end there. The same values feed configurable KPI dashboards - for everyone who prefers to see status live rather than in a document.

Common questions about status reports

What project leads and the PMO want to know before switching.

Yes - and that's the point. Progress plus schedule, cost and performance ratings are fixed parts of every report. Project-specific custom fields can additionally be pinned as report fields without diluting the shared backbone.

Little. Every report is pre-filled from the last report and the current project state, due reports are announced, and pinned fields update as a snapshot automatically. Usually what's left is rating the traffic lights and a short outlook.

Yes. Every report runs through draft, submitted and approved. Once approved, the values are locked, so it's always clear which state applied officially.

Yes. You capture planned value, earned value and actual cost per reporting date; from those, an embedded earned-value dashboard with SPI, CPI and the related charts appears right on the status report page.

Automatically. Approved project and container reports roll up into the portfolio view with a schedule light and overall status per project - with no one collating numbers by hand.

The next status report writes itself, almost

Try WORKSPACE.PM free for 30 days - with structured reports, an approval workflow and portfolio rollup from the very first project.