WORKSPACE.PM
Resource Management

Spot over- and under-allocation before it becomes a problem.

An organization-wide utilization matrix shows, for every person and every machine, who is overbooked in the coming weeks — and where there is still spare capacity. Across all projects, without the spreadsheet puzzle.

Utilization planning3 Overloaded
CW 22
CW 23
CW 24
CW 25
CW 26
S. Merz
82
96
128
104
70
T. Klein
64
78
92
88
96
A. Kaya
58
66
74
120
112
J. Weber
90
102
86
60
48
Press 1
72
84
100
92
78
Utilization:FreeOn trackTightOverloaded

Utilization in % · CW = calendar week

You usually notice capacity only once it runs out.

As long as utilization sits in separate spreadsheets per project, nobody sees the whole picture. Sound familiar?

Overload surfaces too late

Only when someone drops out or resigns does it become clear they were over their limit for weeks.

Utilization only per project

Every project plans its people on its own — nobody sees the sum across all projects.

“Who has time next month?”

The question costs you follow-ups, spreadsheet exports and, in the end, a nagging gut feeling.

Skills stay in people's heads

Who can actually take this on? Without maintained skills, staffing turns into guesswork.

Four steps to an organization-wide resource view

Resource management in WORKSPACE.PM builds up step by step — from skills to steered utilization.

01

Capture skills

Skills, roles and attributes as a taxonomy — for people and machines alike.

02

Define capacity

Daily capacity per person and machine, including working-time model and absences.

03

Bookings flow in

Resource assignments from project planning land in the matrix automatically.

04

Steer utilization

Spot over- and under-allocation, drill into the causes and adjust.

Organization-wide utilization matrix

Your whole organization in one matrix — by weeks or months

Rows per person and machine, columns per period. Every cell shows booked hours against effective capacity — with absences already deducted. Filter down to your team, one skill or just the bottlenecks in seconds.

  • Choose the granularity: weeks or months across the horizon you need
  • Toggle the cell value: utilization in %, booked hours or free hours
  • Filter by department, skill, name or “overbooked only”
  • Grouped by department with a summary row — stays clear even with hundreds of people
Cell values
DepartmentSkillSearchOverbooked only
Engineering3Avg. utilization: 91 %
S. Merz118 %
T. Klein84 %
A. Kaya71 %

12 more hidden

Machines1
Press 192 %
Bookings · S. Merz · CW 24
Booked 46 Std / 40 Std CapacityOverbooked 6 Std

ERP migration

Data migration

18 Hrs

Plant North – expansion

Shell hall 2

14 Hrs

Other project

no access

14 Hrs
To project view

Drill-down & governance

One click on a cell shows where the overbooking comes from

Behind every overloaded cell there are concrete bookings. The drill-down lists them one by one — with project, container and hours. Bookings from projects you are not allowed to see appear as “Other project” instead of exposing internals.

  • Individual bookings per resource and period at a glance
  • Foreign projects are masked, not hidden — the hours still count
  • Jump straight into the project resource view where you have access
  • Understand exactly why someone is over capacity

People and machines

People aren't the only ones with capacity — equipment is too

Press, plotter or test bench: capture non-human capacity carriers with their own daily capacity and attributes. You plan them in the same matrix as people — and take a machine out of planning with a single click during maintenance.

  • Machines with a daily capacity (h/day) as a plannable resource
  • Assign attributes — so machines show up in the skill search
  • Deactivate during maintenance or decommissioning without losing the record
  • Inactive equipment drops out of capacity and the matrix automatically
People

S. Merz

Senior Developer
8 h/dayActive

T. Klein

Project lead
8 h/dayActive
Machines

Press 1

Forming
16 h/dayActive

Plotter A0

Large format
8 h/dayActive

Test bench

Quality assurance
8 h/dayMaintenance
Resource attributes
Skills
ReactTypeScriptScrum MasterWelding
Organizational
Location HannoverFull-time
Interests
AI & automation
Senior DeveloperDay rate: 820 €/PD

Editable in the profile

or centrally by administration

Skills, roles & day rates

Your own skill taxonomy — down to the day rate

Define categories and attributes freely: skills, roles, locations, interests. Each attribute can carry a day rate, so cost is tied directly to skills. Employees maintain their own profile — or administration does it centrally.

  • Freely definable categories and sub-attributes instead of a fixed taxonomy
  • Optional day rate (per person-day) per attribute for cost calculation
  • Self-service in the profile or central maintenance by administration
  • Skills become a filter in the utilization matrix

So the planning doesn't become a project of its own

WORKSPACE.PM takes the data maintenance off your hands instead of creating a second spreadsheet world — exactly where other tools become a burden.

Utilization builds itself

The bookings come from project planning. You maintain the assignment once — the matrix rolls it up organization-wide.

Ready from day 1

A standard taxonomy of skills, organizational attributes and interests is pre-filled. No blank slate after sign-up.

Clear at any size

Department groups collapse automatically when there are many rows, and search opens the matching groups for you.

Where the bookings come from

Utilization is the flip side of project planning

Every resource assignment you make in the project plan becomes visible organization-wide — without anyone copying numbers together. The matrix is the roll-up of your entire project landscape.

Frequently asked questions

What PMOs and resource managers want to know before switching.

From the resource assignments in your projects. As soon as someone is planned into a project, the hours flow into the organization-wide matrix automatically — no separate upkeep required.

Yes. The matrix groups by department with collapsible summary rows and starts collapsed when there are many rows. A search opens the groups with matches automatically.

No. The utilization view requires the right permissions. Bookings from projects a viewer may not see are masked as “Other project” — the capacity impact stays visible, the project internals do not.

Yes. Non-human capacity carriers are captured with their own daily capacity and attributes and planned in the same matrix as people. During maintenance they can be deactivated temporarily.

Yes. Resource and utilization data is available via the REST API under /v1/ — for BI analysis or payroll, for example.

End the utilization blind flight.

Try WORKSPACE.PM free for 14 days — no credit card. See your team's utilization across projects in one place.