Changelog from 04.04.2025

Version 1.11.0

Revised Meetings Module – More Clarity, New Features, Better Work

The Meetings Module in WORKSPACE.PM has been fundamentally revised and elevated to a new level. The completely redesigned user interface provides more clarity and intuitive use – both when creating and participating in meetings. New is the detailed participant list, which now shows exactly when a participant was added and whether or when they viewed the meeting – ideal for transparent communication and better tracking.

In addition, meeting series are now possible, including file uploads directly to the appointment and a practical PDF export of the meeting content. This allows meetings to be better prepared and seamlessly documented. Whether regular jour fixes, ad-hoc votes, or project discussions – the new Meetings Module offers everything to make everyday meetings efficient and clear.

Introduction of Generic Resources – Flexible Planning, Detailed Evaluations

With the introduction of generic resources, resource planning in WORKSPACE.PM becomes significantly more flexible and powerful. Project managers can now not only assign resources directly but also plan them using individually definable resource attributes. This new feature allows for strategic resource management – whether it involves teams, roles, or external capacities.

Particularly helpful: The day-accurate and highly detailed evaluations provide a clear overview of planned effort, overloads, and distribution within individual containers. Evaluations can be conducted both by resource type (e.g., “Designer”, “Developer”, “Consultant”, …) and at the level of each specifically assigned resource (“Max Müller”). This allows bottlenecks to be identified early and capacities to be optimally utilized – for even more precise project planning and better resource management.

Container Duplication – Build Structure Once, Use as Often as Needed

With the new container duplication, efficient work in WORKSPACE.PM becomes even easier. From now on, entire containers including all sub-containers and contained Kanban cards can be duplicated at the push of a button – either within the same project or across projects. This makes it possible to use proven structures as templates and flexibly adapt them to new project contexts.

Particularly strong is the selective use of so-called template projects. Whether onboarding processes, project setups, sprint templates, or QA containers – what has been well thought out once can now be applied multiple times without detours. This saves time, ensures quality standards, and creates space for what matters: good project work.

Corporate KPIs in Reporting – Company Goals Directly in View

From now on, WORKSPACE.PM integrates activated corporate KPIs directly into the project reports and the project brief. This means: Project managers can now see at a glance which strategic target sizes apply to their project – and what the current status is. The KPIs are automatically updated and transparently included in the reporting.

This innovation not only makes it easier to align projects with the corporate strategy but also strengthens management and control at all levels. WORKSPACE.PM thus supports even more targeted alignment of operational implementation and strategic goals – for more impact in every project.

Further Changes